Attach a New Measure to a Project

Any templated measure can be attached to a project.

Note: If the measure template is modified in the future, your project measure will change to reflect those changes.

Note: Multiple measures can exist with the same name. This often occurs when users create multiple versions with updated information or keep a version available to make copies from quickly. Here are the ways in which multiple Measures with the same name are displayed:

Report Wizard: All instances of the same Measure are displayed when the measure name is selected from the list of available Measures.

Measure Mass Attach/Evaluate: If the Attach only if not already attached option is not selected, then every time a new instance of the Measure is created, it will be added to the work item.

Dashboard: The Dashboard only displays one instance of the Measure, which is always the most current version.

Visual Portals: All instances of the Measure are listed, allowing the user to select any desired.

Copy Project: All instances of the Measures are copied to the new Project (no values are copied).

Click Manage Measures

Click Manage Measures

  1. Click the Project button on the Icon Bar.
  2. Click Measures to expand the menu, then click Manage Measures.

Note: Clicking the Project button on the Icon Bar will take you directly to the Summary page of the last work you visited.

Click Attach New

Click Attach New

  • Click Attach New.

Attach Measure

Attach Measure

  • Click the Attach icon next to the measure you want to attach to your project.

View Attached Measures

View Attached Measures

  • View updated list of attached measures.