Measure Entries by Work Data Source

This article provides all the Fields available for each View currently available under Measure Entries by Work Data Source in Upland Analytics.

The following Views are available when Measure Entries by Work Data Source is selected upon creating a report. Click on any of them to view the available Fields.

Note: This page is being updated as new information becomes available.

Basic Details for Work

Field Name Description Type
Cancel Date Work cancel date  
Core Type Work core object type  
Create Date Work creation date  
Created By Work creator ID  
Currency Work currency code

 

Last Change Work last change date

 

Location Work location

 

Location with Icon Work location with image icon display and link to project

 

Master Project Master project name

 

Master Project with Icon Master project name and URL link to the master project

 

Name Work name

 

Name with Object Type Icon Work name with object type icon displayed and URL linked to project

 

Object Type Work object type name

 

Objective Work objective

 

Owner ID Work owner ID

 

Parent ID Parent work ID

 

Percent On Track Percent on track

 

Priority Work priority

 

Project ID Work project ID (user defined ID)

 

Sequence Work sequence number (sequence generated from object type settings)

 

Source Work source

 

Status Work status

 

Status Report Last status report summary text

 

Status Report Days Late Number of status report days late

 

Status with Icon Work status with icon displayed

 

Team Status Given a project and its team members, the longest an invite has been sent and unattended to by one of its team members, in days

 

Template Work template name

 

Top Project Top project name

 

Top Project with Icon Top project name with URL linked to top project

 

Work ID Work ID to join by. This view only returns one row per work ID

 

Work Type Code Object type code (object type ID)

 

Context Currency Default currency defined in context

 

Idea Status Idea status (only for objects derived from idea object type)

 

Idea Status Comment The comment that was included with the most recent Idea status change.  
Is Idea Flag to mark if current work row is an idea, Y for true, N for false

 

Is Program Flag to mark if current work row is a program

 

Measure Entries

Field Name Description Type
Work ID Work ID to join by. This view only returns one row per work ID  
Date Date on which measure value was entered. Only latest measure values as seen in PowerSteering dashboard will be available  
Indicator Color Single letter values denoting the indicator color: R=Red, G=Green, Y=Yellow, U=Unknown  
Measure as Identifier Measure title with all spaces replaced with underscores ( _ ) and special characters removed. Can be used with Upland Analytics formulas  
Measure Title Measure Name

 

Value Value