What's new in this 2015 R1 version?

This article covers the new or upgraded features included in this 2015 R1 release.

Project Status Reporting

Project Status Reporting

Allows Project and Portfolio Managers to track the status of their projects through configurable forms and Key Performance Indicators (KPI's). Updates are time stamped and with powerful analytics users can see how projects are trending. The

module allows the user to create status entries for a project including:

  • Time Phased Project Status Reporting
  • Fully configurable status page allowing customers to completely customize their Key Performance Indicators (KPIs)
  • Trending Reports on the Project Status
  • Ability to lock reporting periods and archive historical Status updates.
  • Track late updates of those who report to you (Group / Portfolio)
  • Archiving of past entries for faster performance and a cleaner User Interface (UI)

The screenshot above shows the Project Status page, where status updates can be made and managed.

Product Central

Product Central

Allows the creation of product entry rules, facilitating the:

  • Controlling of the number of units for a given product entered against a task for a specified price
  • Reporting on consumed & remaining quantity and amount for each rule

Allows for the creation and approval of product entries.

These Product Central capabilities in turn allows:

  • Forecasting the quantity of items to bill ensuring no revenue leakage due to unbilled entries.
  • Billing of recurring entries facilitating quick invoice and revenue recognition.

The screenshot above shows the Product Central page where Product entry rules and Product Entries can be made and managed.

Click here for more information on Product Central

Upland Analytics Enhancements

Visualization

Visualization

  • Addition of a brand new visualization layer allows people to create impressive looking reports.

The images to the left show screenshots that demonstrates how users can configure Upland Analytics to visualize billable versus available hours by user and revenue by country

New Views

The following are the news views:

  • Charge Entry
  • Product Entry
  • Product Entry Rules
  • Expense Entry Basic
  • Expense Entry Extended
  • Expense Report Summary
  • Project Status Report

Financial Planner Enhancements

The following are the enhancements to the Financial Planner Module.

Addition of Forecast Cost and Billing Rules on Project Team

Addition of Forecast Cost and Billing Rules on Project Team

Added the Forecast Cost and Billing Rules columns on the Project Team

  • Easy editing of the forecast rates rules for Users and Roles
  • Displays the current rate rule being applied on the Project

The screenshot above shows the Forecast Cost and Billing Rate Rules.

Enhanced Financial Planner View Options

Enhanced Financial Planner View Options

Enhanced View Options:

  • Billable Time row and Billable POC (Percentage of completion) row have been added to the Time Section
  • Forecast Revenue using Billable POC or Total POC on a project

The screenshot above shows some of the new POC options in the Financial Planner.

New User Experience Enhancements

Autosave of Timesheet Notes

Autosave of Timesheet Notes

  • Timesheet notes now autosave and improved tabbing allows easy tracking of notes against time entries.

New Grid Control

New Grid Control

Improved controls and a cleaner User Interface for the grids.

  • Modified column terminology design
  • Links on pages being altered to button
  • Search controls moved to right-hand side of page
  • Modified context menu
  • Enhanced sorting
  • Modified column selection design
  • Enhanced date selection options for date based searches

Updated Partner Integrations

Accounting Systems:

  • SAGE ERP 300 2014
  • Microsoft Dynamics GP 2015

Customer Relationship Management (CRM):

  • Microsoft CRM Online 2015

Project Management:

  • Microsoft Project 2013

Infrastructure and Architecture Improvements

  • ActiveDirectory TLogin SSO available for PSA Mobile for iOS, Windows Phone and Android devices
  • Currency Exchange API has updated list of supported currencies based on ISO4217
  • Updated exchange rate engine for increased performance