PSA 2026 R1.0 - Resolved Issues

This preview provides an overview of what you can expect in the forthcoming 2026 R1.0 release. However, it is essential to note that the content of this page is subject to change as the release continues to evolve.

While the listed resolved issues are currently expected to be included in the 2026 R1.0 release, the finalized release notes will be available closer to the deployment dates.

PSA 2026 R1.0 is set to be deployed to your staging sites on April 15, 2026. Production sites will be upgraded on May 10, 2026. The listed fixes will become available to you upon upgrading to 2026 R1.0.

Below is a summary of the main issues addressed by this release.

2026.03.18.2026R1.0.V1.EB

Note: This page may be updated as new information becomes available. Visit this page regularly for the latest updates.

Excel Import

N/A TE-105462 Fixed an issue where Excel Milestone imports failed for all subsequent rows after encountering a duplicate Milestone. The import process now handles duplicate entries correctly, allowing valid milestones to continue importing while reporting errors only for the affected rows.
#1924395 TE-105850 Fixed an issue where Excel import allowed invalid Project Priority values to be saved. The system now validates input and restricts values to supported Priorities.

Financial Planner

#1905621 TE-105548 Fixed an issue with the Financial Planner where the Total Actual column could display zero despite individual monthly values being present. The calculation logic has been corrected to ensure that total actuals are accurately aggregated and displayed in line with the underlying monthly data.

Homepage Templates

N/A TE-105130 Fixed an issue in the Homepage Quick Links widget where UI elements overlapped in the Template designer, preventing users from saving and causing display inconsistencies.
#1904909 TE-105544 Fixed an issue with the Homepage Templates Designer page where the Designer tab could fail to load and display a blank page for Templates containing multiple My Projects widgets. The issue has been resolved to ensure the Designer loads correctly and allows widgets to be configured as expected.

New Timesheet

#1907238 TE-105576 Fixed an issue on the Project assignment and Timesheet Entry experience where the Task dropdown did not filter based on the selected Project Work Type, and the Work Type field did not update dynamically when a Task was selected. The Task list now correctly reflects tasks associated with the selected Work Type, and the Work Type is properly updated in alignment with the selected Task.

Notifications

#1906563,
#1906644
TE-105589 Fixed an issue with Announcement Notifications where the Scheduled Send Date could not be updated beyond the Valid Until date when that date was in the past. The date selection now behaves correctly, allowing you to update the Scheduled Send Date.

Organization Breakdown Structure (OBS)

N/A TE-105485 Fixed an issue where Invoice PO associations could not be deleted due to minor calculation discrepancies. The validation logic has been updated to ignore insignificant differences, allowing the association to be removed successfully when no meaningful variance exists.
#1902322 TE-105497 Fixed an issue where updating a PO Amount without changing its value could incorrectly trigger a validation error. The system now allows unchanged values to be saved without error.

Timesheet Manager

N/A TE-105180 Fixed an issue where the Timesheet Manager could experience delays or timeouts when using the Everyone who reports to me View. Performance has been optimized to ensure the view loads reliably and returns results within an expected timeframe.

Tools - Excel Import

#1924395 TE-105850 Fixed an issue with Excel import where invalid values could be accepted for Project Priority. The import process now validates the provided value and only allows recognized Priority values, preventing incorrect entries from being saved and ensuring reports reflect accurate data.

Project Management

#1904136 TE-105533 Fixed an issue on the Project List page where the Project State tooltip could persist incorrectly during quick navigation between records. The tooltip behavior has been corrected to ensure it displays and dismisses consistently based on user interaction.
#1929584 TE-105957 Fixed an issue where updating Milestones status could result in prolonged loading or timeouts for Projects with an excessively large number of milestones. Performance has been improved through query and index optimization to ensure timely updates.

Project Work Plan

N/A TE-105591 Fixed an issue with Project Work Plan where using the “=” operator with a browse UDF could result in a conversion error when saving and running Find Matches. The system now correctly handles UDF values during matching, preventing data type conversion errors and allowing matches to be processed successfully.

Reporting

N/A TE-105362 Fixed an issue where the Group Time Detail report could experience slow performance and inconsistent execution times. Performance has been optimized to ensure faster and more consistent report generation.
#1915077 TE-105764 Fixed an issue with Upland Analytics where a report could fail to load or time out when filtering by certain Parent Project values.

Resource Management

#1895378 TE-105378 Fixed an issue where Role Booking updates failed for weeks containing the Project Start Date.

Timesheet

#1922181 TE-105808 Fixed an issue where users received a “non-allocated in/out hours” error when submitting a timesheet, even though all hours appeared to be fully allocated.

Work Breakdown Structure (WBS)

#1866238,
#1870619,
#1890538
TE-104930 Fixed an issue where adding a Work Type to a Group could incorrectly trigger an error. The validation logic has been corrected to ensure Assignment dates are evaluated appropriately, allowing Work Types to be added successfully when valid conditions are met.